{"id":32045,"date":"2021-04-27T10:37:13","date_gmt":"2021-04-27T08:37:13","guid":{"rendered":"https:\/\/www.sacome.com\/?p=32045"},"modified":"2021-04-27T10:41:11","modified_gmt":"2021-04-27T08:41:11","slug":"hear-exchanger-cipp-cured-in-place-pipe","status":"publish","type":"post","link":"https:\/\/www.sacome.com\/en\/hear-exchanger-cipp-cured-in-place-pipe\/","title":{"rendered":"Heat exchanger intended for CIPP (cured-in-place pipe)"},"content":{"rendered":"<p>[et_pb_section bb_built=&#8221;1&#8243; fullwidth=&#8221;off&#8221; specialty=&#8221;off&#8221; next_background_color=&#8221;#000000&#8243;][et_pb_row][et_pb_column type=&#8221;1_5&#8243;][\/et_pb_column][et_pb_column type=&#8221;3_5&#8243;][et_pb_image src=&#8221;https:\/\/www.sacome.com\/wp-content\/uploads\/2017\/06\/Intercambiador-de-Calor_I-TFM-I_SACOME.png&#8221; alt=&#8221;Heat exchanger intended for CIPP system (cured-in-place pipe)&#8221; title_text=&#8221;Heat exchanger intended for CIPP (cured-in-place pipe)&#8221; _builder_version=&#8221;3.21&#8243; align=&#8221;center&#8221; \/][\/et_pb_column][et_pb_column type=&#8221;1_5&#8243;][\/et_pb_column][\/et_pb_row][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text _builder_version=&#8221;3.21&#8243; border_style=&#8221;solid&#8221;]<\/p>\n<h2>How to avoid hot water boiler fouling problem in CIPP (cured-in-place pipe)<\/h2>\n<p>[\/et_pb_text][et_pb_text _builder_version=&#8221;3.21&#8243; border_style=&#8221;solid&#8221;]<\/p>\n<p style=\"text-align: justify;\"><strong><a href=\"https:\/\/www.sacome.com\/en\/about-sacome\/\" rel=\"noopener\" target=\"_blank\">SACOME<\/a><\/strong> receives a request from a company specialized in in-situ pipe repair using the <strong>CIPP<\/strong> technology \u2014<strong>cured-in-place pipe<\/strong>. This method allows the rehabilitation of water, gas and chemical lines that require repair or sealing, by introducing a flexible tube impregnated with resin, without the need for excavation or earthworks.<\/p>\n<p style=\"text-align: justify;\">This company installs the system in trucks. The company has a boiler to generate the needed hot water for the curing process. The main drawback is that the <strong>boiler<\/strong> and its <strong>circuit<\/strong> get dirty with the <strong>resin<\/strong> used, which means <strong>power loss<\/strong> and continuous <strong>cleaning work<\/strong>.<\/p>\n<p style=\"text-align: justify;\">SACOME&#8217;s engineers design two <strong><a href=\"https:\/\/www.sacome.com\/en\/multitube-industrial-heat-exchanger\/\" rel=\"noopener\" target=\"_blank\">I-TFM-I heat exchangers with corrugated tubes<\/a><\/strong>, one for a water volume of 30 m\u00b3, and the other one for a water volume of 60 m\u00b3, so that <strong>the hot water circuit becomes independent from the dirty water circuit<\/strong>. Therefore, the existing <strong>fouling problem is solved<\/strong>.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section][et_pb_section bb_built=&#8221;1&#8243; _builder_version=&#8221;3.0.47&#8243; prev_background_color=&#8221;#000000&#8243;][et_pb_row _builder_version=&#8221;3.0.48&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221;][et_pb_column type=&#8221;4_4&#8243;][et_pb_text _builder_version=&#8221;3.21&#8243; text_orientation=&#8221;center&#8221;]<\/p>\n<h3>Technical documentation heat exchangers<\/h3>\n<p>[\/et_pb_text][et_pb_blog fullwidth=&#8221;off&#8221; posts_number=&#8221;3&#8243; include_categories=&#8221;33&#8243; show_author=&#8221;off&#8221; show_date=&#8221;off&#8221; show_pagination=&#8221;off&#8221; use_overlay=&#8221;on&#8221; overlay_icon_color=&#8221;rgba(53,120,155,0.55)&#8221; _builder_version=&#8221;3.17.6&#8243; header_level=&#8221;h3&#8243; \/][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>How to avoid hot water boiler fouling problem in cured-in-place pipe (CIPP) by means of corrugated tube heat exchangers.<\/p>\n","protected":false},"author":2,"featured_media":1957,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[47],"tags":[],"class_list":["post-32045","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.sacome.com\/en\/wp-json\/wp\/v2\/posts\/32045"}],"collection":[{"href":"https:\/\/www.sacome.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sacome.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sacome.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sacome.com\/en\/wp-json\/wp\/v2\/comments?post=32045"}],"version-history":[{"count":4,"href":"https:\/\/www.sacome.com\/en\/wp-json\/wp\/v2\/posts\/32045\/revisions"}],"predecessor-version":[{"id":32051,"href":"https:\/\/www.sacome.com\/en\/wp-json\/wp\/v2\/posts\/32045\/revisions\/32051"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sacome.com\/en\/wp-json\/wp\/v2\/media\/1957"}],"wp:attachment":[{"href":"https:\/\/www.sacome.com\/en\/wp-json\/wp\/v2\/media?parent=32045"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sacome.com\/en\/wp-json\/wp\/v2\/categories?post=32045"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sacome.com\/en\/wp-json\/wp\/v2\/tags?post=32045"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}